Fire Protection Supervision and Conformity

We supervise fire protection installation, approve materials and review tests so the works match the approved drawings at handover.

References
Saudi Building Code – Fire Code (SBC 801)
Licence
Saudi Council of Engineers · 5110001699
Sectors
Malls & Retail, Healthcare, Hospitality

When you need fire protection supervision

If one of these sounds like your situation, this is where the service starts.

Installer fixing sprinkler pipe to a concrete ceiling
  • Installer fixing sprinkler pipe to a concrete ceilingFire alarm or suppression installation is starting
  • Stacked steel pipes before supplySafety materials and equipment need approval before supply
  • Exit sign above a door in a finished buildingHandover is close and the works need conformity checks
  • Calculator and bid papers on a deskContractor bids need technical and financial review

What supervision and conformity checks include

The scope as we deliver it, item by item.

  1. Supervision of safety system installation

    We follow the alarm and suppression installation on site against the approved drawings and specifications, with periodic supervision reports.

  2. Contract checks and bid review

    Before work starts, we check the contractor’s contract against the drawings and technical study, and review bids technically and financially.

  3. Material approval to contract and Civil Defense requirements

    We review safety materials and equipment before they are supplied, and approve those that meet the contract and Civil Defense requirements.

  4. Inspection, test result review and conformity verification

    We inspect the installed works, review the test results and verify that they conform to the approved drawings before handover.

  5. Technical reports, observations and corrective actions

    We write the technical reports and log each observation with its corrective action, following it through to close-out.

Consultant inspection and specialist testing

We distinguish consultant review and inspection from specialist testing that requires an accredited laboratory or provider.

What you receive

Clear documents you can rely on with the authorities and the delivery team.

  • Periodic supervision reports

    Document 01

  • Observation and close-out log

    Document 02

  • Material approvals

    Document 03

  • Final conformity report

    Document 04

Supervision stages

  1. Contract review

    We check the contract against the drawings and study.

    Engineer checking a drawing on site
  2. Material approval

    We approve materials before they are supplied.

    Inspector examining pipes at the supplier
  3. Site supervision

    We follow installation on site, with periodic reports.

    Supervisor checking works on the scaffold
  4. Test review

    We inspect the works and review the test results.

    Fire hydrant discharging water during a test
  5. Handover

    We verify conformity and hand over the final report.

    Finished space ready for handover

Codes and references

  • Saudi Building Code – Fire Code (SBC 801)
  • Civil Defense requirements
  • Approved drawings and specifications

Sectors

We know each sector’s requirements and shape our work around how it runs.

Safer. Compliant. Ready.