Fire & Life Safety Design and Studies

We design and review alarm, suppression and egress drawings to the Saudi Building Code and Civil Defense requirements, so they reach review with fewer comments.

References
Saudi Building Code – Fire Code (SBC 801)
Licence
Saudi Council of Engineers · 5110001699
Sectors
Malls & Retail, Healthcare, Hospitality

When you need safety drawings or a technical study

If one of these sounds like your situation, this is where the service starts.

Floor plan being drafted with set squares on a drawing board
  • Floor plan being drafted with set squares on a drawing boardA new project at design stage needs safety drawings
  • Technician on a ladder opening a ceiling access panel in an existing buildingAn existing building needs its real condition assessed before licensing or redevelopment
  • Interior under renovation with new steel stud framing and an exposed ceilingA change of use or extension affects fire protection systems
  • Stack of documents flagged with review tabsDrawings were returned with authority comments

What our fire safety design covers

The scope as we deliver it, item by item.

  1. Fire & life safety technical studies

    We study the facility and its requirements, assess its risks and gaps, and set out the findings in a technical study report.

  2. Alarm & detection, suppression, egress drawings

    We develop the engineering solutions and draw each system to the Saudi Building Code and Civil Defense requirements.

  3. Design review for code and Civil Defense compliance

    We review designs, including drawings returned with authority comments, and give you our review comments and recommendations.

  4. Existing buildings: survey, assessment and remediation

    We survey the systems already in place, assess the building’s real condition and set out a remediation plan.

Existing office building lobby with an exit sign

Fire safety assessment for existing buildings

We help owners understand the building’s real condition and define only the works needed, instead of producing new drawings without studying what is already there.

Request a building assessment

What you receive

Clear documents you can rely on with the authorities and the delivery team.

  • Technical study report

    Document 01

  • Safety system drawings

    Document 02

  • Review comments and recommendations

    Document 03

  • Existing-building assessment and remediation plan

    Document 04

How we prepare your safety drawings

  1. Understand the facility

    We study the facility, its use and the requirements that apply to it.

    Inspectors walking a large warehouse interior
  2. Assess risks and gaps

    We assess its risks and the gaps against the requirements.

    Fire alarm manual call point and its sign on a concrete wall
  3. Develop solutions

    We develop the solutions and draw each system to the Saudi Building Code.

    Engineering drawing open in CAD software on a screen
  4. Verify compliance

    We check the drawings against the code and Civil Defense requirements.

    Engineer in a hard hat checking a wall-mounted device

Codes and references

  • Saudi Building Code – Fire Code (SBC 801)
  • Civil Defense requirements
  • Referenced international standards where applicable

Sectors we design for

We know each sector’s requirements and shape our work around how it runs.

Safer. Compliant. Ready.

Tell us about your facility and an engineer will be in touch.