Specialised Fire Engineering Studies

Structural fire resistance, smoke control and hydraulic studies for cases where standard solutions fall short.

References
Saudi Building Code – Fire Code (SBC 801)
Licence
Saudi Council of Engineers · 5110001699
Sectors
Healthcare, Industrial & Logistics, Government & Commercial

When you need a specialised fire study

If one of these sounds like your situation, this is where the service starts.

Historic buildings with wooden roshan balconies in Al-Balad, Jeddah
  • Historic buildings with wooden roshan balconies in Al-Balad, JeddahAn existing building can't meet requirements with standard solutions
  • Stacks of files marked with review tabsRepeated technical comments are blocking the licence
  • Large empty warehouse under a wide-span steel roofLarge open spaces or complex mixed uses
  • Exposed steel beams in a building under constructionStructural fire resistance must be documented

Studies we deliver

The scope as we deliver it, item by item.

  1. Structural fire resistance

    We assess the fire resistance of structural elements and document it with calculations and technical justification in the study report.

  2. Fire compartmentation

    We set out the building’s fire compartments to suit its spaces and uses, including large open areas and complex mixed uses.

  3. Smoke control review

    We review smoke control systems against the Saudi Building Code and Civil Defense requirements, with calculations and technical justification.

  4. Hydraulic calculation review

    We check the hydraulic calculations for suppression networks against the building’s requirements and record the results in the study report.

  5. Alternative solutions and deficiency analysis

    We justify alternatives where standard solutions fall short, trace repeated comments to their causes and follow the remediation through to compliance.

Solving the technical problem that blocks the project, not just producing new documents.

What you receive

Clear documents you can rely on with the authorities and the delivery team.

  • Study report with calculations and technical justification

    Document 01

  • An actionable remediation plan

    Document 02

How we solve the technical problem

  1. Analyse the problem

    We trace the problem and repeated comments to their causes.

    Examining floor plans with a magnifying glass
  2. Study alternatives

    We study the alternatives where standard solutions fall short.

    Sketching a decision flowchart of options
  3. Technical justification

    We back the chosen solution with calculations in the study report.

    Scientific calculator on calculation sheets
  4. Through to compliance

    We set an actionable remediation plan and follow it through.

    Ventilation units installed on a metal roof

Codes and references

  • Saudi Building Code – Fire Code (SBC 801)
  • Civil Defense requirements
  • Referenced international standards where applicable