The most common Civil Defense comments and how to avoid them
Many facilities receive Civil Defense comments when they apply for or renew a safety licence, and the same comments tend to come up again and again. The good news is that most of them can be anticipated and dealt with before the inspection. This article covers the most common comments, their usual technical causes and how to stop them returning at the next renewal.
Why do the same Civil Defense comments keep coming back?
A comment does not always mean a facility is unsafe. Often the cause is a gap between what was approved on paper and what is actually on site, or a change in how the space is used that never made it into the drawings and systems.
Causes we see often in day-to-day practice include:
- Changes after approval: partitions, shelving or a new layout added without checking the effect on safety.
- A change of activity or use: each use can carry different requirements, and what suits an office does not necessarily suit a warehouse or a restaurant.
- Patchy maintenance: systems that were installed properly, then left unmaintained or undocumented.
- Last-minute preparation: getting the site ready on inspection day only, instead of keeping it ready all the time.
Understanding these causes is the first step, because a comment fixed without knowing its cause usually returns at the next visit.
What are the most common comments at a Civil Defense inspection?
Comments vary with the type of facility, its activity and its size, but some categories appear in most inspections. The table below sums up the main ones, the usual cause behind each and how to resolve it at the root.
| Comment | Usual cause | Suggested fix |
|---|---|---|
| A blocked or narrowed escape route | Temporary storage, furniture or displays in corridors | A fixed layout and staff trained to keep routes clear |
| An emergency exit locked during operation | Locked for security with no alternative | Reviewing suitable locking solutions with the engineer so security and safety both hold |
| Exit signs or emergency lighting not working | No routine testing | A regular testing schedule and a log of every test |
| An alarm or suppression system that does not match the drawing | Changes on site without updating the drawings | Updating the drawings to match what was built, and approving them |
| Unsuitable or out-of-date extinguishers | Type chosen without assessment, or no follow-up | Choosing the type for the hazard and keeping it inspected by an approved maintenance provider |
| Undocumented maintenance | No maintenance contract or regular records | A regular maintenance contract with reports kept on file |
Notice that the fix column targets the cause, not the symptom. Clearing an obstruction on the day satisfies the inspector once; changing how the space is run stops the comment coming back.
How do you avoid comments on escape routes and exits?
Escape routes are among the first things checked on site, because they decide whether people can evacuate safely. For the general principles behind planning them, read our guide to emergency exits and escape routes under the Saudi Building Code.
The detailed requirements, such as the number of exits, their sizes and travel distances, depend on the type of facility, its use and its occupancy. They are set by the Saudi Building Code for fire protection (SBC 801) and should be confirmed by a licensed engineer for each case.
Day to day, a few simple habits prevent most comments. Keep corridors free of storage, never lock emergency doors in a way that stops them opening when needed, and make sure exit signs are visible and lit.

A facility that is ready for inspection on any day needs no special preparation for the visit.
Why do fire system maintenance comments keep recurring?
Alarm and suppression systems can be installed correctly and still attract comments because maintenance is irregular or undocumented. At renewal especially, continued maintenance is often looked at as closely as the system itself.
To avoid this, keep a maintenance contract with an approved provider and a log of inspection dates and what was done at each visit. Staff should also know where the alarm panel is and what to do when the alarm sounds.
If maintenance shows that part of a system no longer covers the space after a layout change, treat it as a signal to review the design with an engineer before it becomes a formal comment.
How do you prevent a safety licence rejection over drawings and documents?
Many safety licence rejections start in the file, not on site. A drawing that does not match reality, or an unclear document, can send the application back before the inspection even happens.
Before submitting on the Salamah platform, check that the approved drawings show the facility’s current layout and that the safety systems on them match what is installed. The documents required vary with the type of facility and its activity, so confirm what applies to yours before you start.
For the order of the stages, from creating the application to the decision, see our guide to the steps to issue a safety licence on the Salamah platform.
What is the right way to resolve Civil Defense comments once issued?
If your application comes back with comments, an organised response saves time and makes repeats less likely. These are practical steps engineers usually follow:
- Read the comment as written: pin down exactly what is asked before changing anything.
- Find the root cause: is the problem in how the space is run, in the system or in the drawing?
- Fix it on site and on paper: a change on site without an updated drawing can create a new comment.
- Record what was done: photos, reports and updated drawings to attach when you resubmit.
- Stop it returning: build what you learned into your operating and routine maintenance procedures.
When comments keep coming back or need drawings revised and approved, a licensed consultant shortens the path. See our service for resolving Civil Defense comments in Jeddah as part of safety licensing.
Common questions about Civil Defense comments
Usually not. Comments are a normal part of the review; once they are resolved and documented, the file is resubmitted to complete the application.
It depends on the comment. Some are operational and fixed on site, others need the drawings updated and approved, and the engineer decides which after reviewing the case.
Check escape routes and exits, alarm and suppression systems and maintenance records before the visit. Better still, keep the facility at that standard all year.
When the same comments keep returning, when the facility is large with many systems, or when it needs a technical study or revised drawings.