Hospital fire safety during renovation is unlike safety on any other site, because the building never stops and the patients do not leave. The hospital keeps admitting cases and running its departments while walls come down and new systems go in, sometimes on the same floor. This article explains how hospital safety is managed during works, and what an engineer reviews before and during them.

Why is patient evacuation harder during works?

In most buildings the answer to a fire is to get out quickly. In a hospital, many patients cannot move on their own, and some are connected to equipment that cannot easily be disconnected.

Hospitals therefore usually rely on progressive horizontal evacuation: moving patients sideways from the fire zone into a protected neighbouring zone on the same floor, before evacuating the building is considered. That only works if the barriers between zones stay intact.

This is where works become dangerous: they can open those barriers, or close a route the staff depend on, without anyone noticing. Hospital fire safety during renovation therefore starts with protecting those barriers and routes. You will find a summary for this sector under fire safety requirements for hospitals and medical centres.

How do you keep passive fire protection and fire compartmentation intact?

Passive fire protection is the built fabric that contains fire and smoke without anyone acting. Fire compartmentation divides a hospital so that a fire stays in its zone long enough for patients to be moved.

Renovation touches these elements more than people expect. Among the most affected:

  • Service penetrations: holes cut through walls and slabs for cables and pipes, then not sealed with suitable materials.
  • Fire doors: wedged open to make the workers’ route easier, or with their self-closers removed.
  • Fire and smoke dampers: in the ductwork, covered or disabled during the works.
  • Suspended ceilings: tiles removed, opening a path for smoke over the separating walls.
A steel structure with fire-resistant coating and a smoke control fan
Passive protection works silently, which is why works can compromise it unnoticed.

The resistance each barrier needs depends on how the area is used and the applicable code, and a licensed engineer confirms it against the Saudi Building Code – Fire Code (SBC 801). During works, what matters is that every penetration is inspected, sealed and recorded before the ceiling is closed over it.

How do you keep alarm systems live during works?

Keeping alarm systems live during works is a real challenge: dust causes false alarms, which tempts people to isolate detectors or shut down parts of the system. In a working hospital, the isolated zone may be the one closest to patients.

Every impairment is therefore planned in advance and treated as a temporary state with an owner, a start and an end:

Managing safety system impairments during works
SituationUsual interim measureWho follows it
Detectors isolated in the work areaDefine the isolated zone precisely, and restore the detectors as soon as work stopsSafety lead with the maintenance team
Part of the sprinkler system shut downNotify the affected departments and assign a temporary fire watchHospital management and the contractor
An escape route alteredTemporary signage and briefing staff on the alternative routeSafety lead and heads of department

The interim measures required depend on the type of impairment and how the area is used, and are agreed with the engineer before work starts, not after.

In a working hospital, every system taken out of service needs a known return time and a known owner.

Why are hot work permits essential in a hospital?

Welding, cutting and grinding are among the most common ignition sources on renovation sites. In a hospital the risk is greater because of medical oxygen, and flammable materials in stores and laboratories.

Hot work permits turn this work from an individual decision into a reviewed procedure: the area is checked before starting, combustibles are removed or covered, and suitable extinguishing equipment is at hand. Someone also stays on watch after the work ends, because a fire can start later inside walls or ceilings.

It helps to tie the permit to any detector isolation, so that no detector is isolated without a known permit, or forgotten once the work is done.

How do you manage contractors in a live hospital?

Managing contractors in a live hospital is what holds everything above together. A contractor knows the trade, but may not know that the door left open separates an inpatient ward from the fire zone.

Good management starts before the first worker arrives: briefing contractors on the building’s risks, setting their access and material routes away from patient routes, and agreeing who issues permits and who can stop work when there is a hazard. Engineering supervision and conformity checks help here, following the works on site and confirming that what is built matches what was approved.

Regular joint walkdowns by hospital management, the contractor and the engineer also help, with findings recorded and followed until they are closed.

How is the patient evacuation plan updated as works progress?

An evacuation plan approved before the works may no longer fit after their first phase. Each phase can close a corridor, move a department or shift the protected neighbouring zone.

  1. Review the plan at each phase: identify the routes and protected zones the works affect.
  2. Update drawings and signs: revise the posted evacuation plans and wayfinding signs when a route changes.
  3. Brief the staff: explain the change to heads of department and nursing staff on every shift.
  4. Practise the new route: a short drill exposes obstacles before a real event does.

See what an emergency and evacuation plan should include for its essentials, then adapt it to each phase of the hospital works. In the end, success is measured by every member of staff knowing today’s route, not the route from before the works began.

Questions about hospital fire safety during renovation

Not necessarily; much work is carried out while the hospital operates. It does require a clear plan to isolate the work area and keep escape routes and alarm systems working.

Responsibility is usually shared and set out in the contract and the works safety plan. What matters most is that every measure, such as permits and system isolations, has a named owner.

That depends on the type and scope of the works, and whether they change the protection systems or the approved drawings. A licensed engineer determines what is needed before work starts.