Many owners commission a fire safety study for existing buildings when something about the building changes: its use, its size or its systems, or when the same comments keep returning on the licence file. A building designed for one purpose years ago may not meet the fire safety requirements of its current use. This article sets out the cases that call for a study, what it covers and how its findings become a realistic remediation plan.

What is a safety study for an existing building?

A safety study for an existing building is an engineering assessment that compares the building as it actually stands with the fire protection requirements that apply to it today. It differs from designing a new building, because the engineer is working with walls, stairs and systems that cannot easily be changed.

So the aim is not only to list shortfalls but to find a practical way to raise the level of safety with as little disruption to the building and its operation as possible. The engineer works from the Saudi Fire Code (SBC 801) and the related requirements for the type of building.

The study usually ends in a report that describes the existing condition, identifies the gaps and proposes solutions in order of priority, often with drawings of the proposed condition.

In which cases does an existing building need a study?

Not every existing building needs a study, but some cases come up again and again in practice and make it an important step before licensing or operation. The table below sums up the main ones:

Common cases that call for an existing building safety study
CaseWhy it calls for a studyWhat the study usually focuses on
Change of useThe new use may change the occupancy classification and the number of occupantsExits, escape routes and the systems the new use requires
Extension or added floorsThe extra area affects the existing building, not only the new partWhether the systems and exits suffice for the extended building
Repeated licence commentsA recurring comment often points to a design cause rather than an operational oneFinding the root cause and proposing a lasting fix
An older building without current drawingsThere is no clear record of what was actually builtSurveying and recording the existing condition before any change

The third case is frequent in facility files, and we explain its causes in the most common Civil Defense comments and how to avoid them. If the same comment returns after it was resolved, the building needs a closer look.

Why does a change of use or an extension affect fire safety requirements?

Fire protection requirements rest on how a building is used, how many people occupy it and what is stored in it. Turning a warehouse into a showroom, flats into offices or offices into an educational facility can change the requirements fundamentally.

With an extension, it is not enough for the new part alone to be designed correctly. Added area or floors can leave the existing exits short, or require the alarm and suppression systems to be extended to cover the whole building.

That is why a fire safety study for existing buildings is best carried out before the alteration, not after it. Finding a gap on paper costs far less than finding it once the fit-out or extension has been built.

What does an existing building assessment and fire system survey include?

The details of each study depend on the building and its purpose, but most go through similar stages:

  1. Gathering information: reviewing the available drawings, previous licences and maintenance reports, and understanding the current and proposed use.
  2. Site visit: inspecting the building and comparing what is actually there with the drawings, since the two often differ in older buildings.
  3. Fire system survey: recording the alarm, suppression, emergency lighting and smoke control systems, their condition and their coverage.
  4. Escape route assessment: reviewing exits, stairs and corridors for number, capacity and continuity to the outside.
  5. Gap analysis: comparing the existing condition with the applicable requirements and identifying what needs to be addressed.
Hands marking up a fire safety drawing, seen from above
The assessment starts by comparing the available drawings with what is actually on site.

How is the remediation plan built after the study?

The outcome of a study is not a long list of works to carry out all at once. A good plan orders the measures by the seriousness of each gap and the realities of the building and its operation, for example:

  • What directly affects life safety: such as blocked exits or failed systems, comes first.
  • What needs structural or architectural work: such as adding an exit or enclosing a stair, is planned carefully because it affects operation.
  • What concerns the systems: such as extending alarm or suppression coverage, is coordinated with contractors and suppliers.
  • What concerns management and operation: such as routine maintenance, training and the evacuation plan, costs less and takes effect sooner.

The agreed measures then become drawings submitted to the authorities as part of the licence file. This is where fire and life safety design turns the study’s findings into solutions that can be built and approved.

A good study does not only ask what the building lacks, but what the shortest realistic route is to making it safe.

When are alternative solutions considered for existing buildings?

In some buildings the literal requirement is hard to apply, such as when a new stair cannot be added or an existing corridor widened without major demolition. In these cases the engineer may turn to alternative solutions that achieve an equivalent level of safety in a different way.

Examples include enhanced early detection or suppression, added smoke control measures or changes to how the building is operated. Their acceptance is not automatic: they need a documented engineering justification that the relevant authority reviews and decides on.

This may call for deeper analysis, such as smoke spread modelling or evacuation simulation, which is what specialist fire engineering studies provide. As a rule, a fire safety study for existing buildings is the starting point, and it shows whether the building needs that level of analysis.

Questions about a fire safety study for existing buildings

No; many buildings only need routine maintenance and licence renewal. A study becomes important with a change of use, an extension, repeated comments or missing up-to-date drawings.

Not necessarily. A study may show the gaps are limited and can be resolved with operational measures or minor changes; the scale of the work is set after the assessment, not before.

The engineer then starts by surveying the existing condition on site and recording it in new drawings. Those drawings become the reference for the study and for later alterations.